First tranche delivered, larger tranches en route: the same engine that just produced has visibly more already scheduled
The model's full reasoning — Q1 2024 call → NOWe need to determine if management describes one identifiable engine of new business with both: (1) a first tranche actually landed in the just-reported period (Q1 2024), and (2) larger tranches already in motion behind it, with the remainder larger than what's been recognized. Look for specific projects, contracts, expansions, etc. The transcript mentions several: Gillis Access project placed into service in March 2024, with a bill multiple of ~6x. That's a landed tranche. But is there a larger tranche of the same engine? Gillis is a specific pipeline project; no mention of further phases. Southeast Gateway: offshore pipe installation over 70% complete, onshore permits obtained, construction on landfall sites complete. The project is still under construction, not yet in service. So no landed tranche yet. Bruce Power Unit 3 MCR: tracking cost and schedule, Unit 4 approved to begin in early 2025. That's a major component replacement program. Unit 3 is in progress, not yet completed? Actually, the transcript says "Bruce Power Unit 3 MCR" is tracking cost and schedule. It's not stated that Unit 3 has been completed or recognized revenue. So no landed tranche. Coastal GasLink: expected to be placed into commercial in-service later this year. Not yet. Asset divestitures: PNGTS sale, CFE purchase of equity interest in TGNH. That's not an engine of new business; it's divestiture. Data center demand: management discusses potential demand, but no specific landed tranche. The question asks for an engine of new business with a first tranche actually delivered in the just-reported period. The only concrete delivery mentioned is Gillis Access project placed into service in March 2024. But is there a larger tranche of the same engine? Gillis is a single project. No mention of further expansion of that specific system. Another possibility: The NGTL system deliveries, record volumes, but that's routine operations, not a new engine. The question requires that the landed portion is the smaller share, with larger tranches already in motion. For Gillis, there's no indication of further phases. Thus, no. Answer: NO.
| Ticker | Company | Call | Date | Call grade |
|---|---|---|---|---|
| ASO | Academy Sports and Outdoors, Inc. | Q1 2024 | 2024-06-11 | C+ |
| ATAT | Atour Lifestyle Holdings Limited | Q1 2024 | 2024-05-23 | B+ |
| LINC | Lincoln Educational Services Corporation | Q1 2024 | 2024-05-06 | B+ |
| LTRX | Lantronix, Inc. | Q3 2024 | 2024-04-29 | C |
| E | Eni S.p.A. | Q1 2024 | 2024-04-24 | B+ |
| FRPH | FRP Holdings, Inc. | Q4 2023 | 2024-03-07 | C+ |
| ZLAB | Zai Lab Limited | Q4 2023 | 2024-02-28 | C |
| VMI | Valmont Industries, Inc. | Q4 2023 | 2024-02-22 | C |
| TBLA | Taboola.com Ltd. | Q3 2023 | 2023-11-08 | B+ |
| JLL | Jones Lang LaSalle Incorporated | Q3 2023 | 2023-11-02 | F |
| TEL | TE Connectivity Ltd. | Q4 2023 | 2023-11-01 | B |
| CLNE | Clean Energy Fuels Corp. | Q2 2023 | 2023-08-09 | C+ |
| LUCD | Lucid Diagnostics Inc. | Q1 2023 | 2023-05-16 | C+ |
| CEIX | CONSOL Energy Inc. | Q4 2022 | 2023-02-07 | B |
| ARE | Alexandria Real Estate Equities, Inc. | Q4 2022 | 2023-01-31 | C+ |
| SOL | ReneSola Ltd | Q3 2022 | 2022-12-01 | C+ |
| SYM | Symbotic Inc. | Q3 2022 | 2022-08-01 | B+ |
| CDMO | Avid Bioservices, Inc. | Q3 2022 | 2022-03-08 | B+ |
| DG | Dollar General Corporation | Q2 2021 | 2021-08-26 | A |
| DOV | Dover Corporation | Q2 2021 | 2021-07-20 | B+ |
| MAS | Masco Corporation | Q3 2018 | 2018-10-30 | C |
| FEIM | Frequency Electronics, Inc. | Q1 2019 | 2018-09-13 | B+ |
| SRDX | Surmodics, Inc. | Q3 2018 | 2018-08-06 | A |
| IRT | Independence Realty Trust, Inc. | Q2 2018 | 2018-08-02 | B |
| MGA | Magna International Inc. | Q1 2018 | 2018-05-10 | B+ |
| SATS | EchoStar Corporation | Q1 2018 | 2018-05-10 | C+ |
| RACE | Ferrari N.V. | Q3 2017 | 2017-11-02 | C+ |
| FLEX | Flex Ltd. | Q1 2018 | 2017-07-28 | F |
| HR | Healthcare Realty Trust Incorporated | Q1 2017 | 2017-05-08 | A |
| BDN | Brandywine Realty Trust | Q1 2017 | 2017-04-21 | C+ |
| WTS | Watts Water Technologies, Inc. | Q4 2016 | 2017-02-10 | B |
| PSX | Phillips 66 | Q4 2016 | 2017-02-03 | C+ |
| LBTYK | Liberty Global's | Q1 2016 | 2016-05-10 | C+ |
| GOGO | Gogo Inc. | Q1 2016 | 2016-05-06 | C+ |
| MTRX | Matrix Service Company | Q3 2016 | 2016-05-05 | D |
| CLF | Cleveland-Cliffs Inc. | Q1 2016 | 2016-04-29 | F |
| DD | DuPont de Nemours, Inc. | Q1 2016 | 2016-04-26 | B+ |
CDMO · Q3 2022 → YESThe question is about whether management describes ONE identifiable engine of new business that meets two criteria: NO The transcript describes the first phase of the Myford expansion as now operational and scheduling client projects, with management noting they are already utilizing the new space and that an extra $5 million is arguably in backlog attributable to it.
LINC · Q1 2024 → YESThe question is about whether management describes ONE identifiable engine of new business that meets two criteria: YES The transcript identifies the new-campus expansion strategy as the engine. East Point opened in Q1 with 29 starts and $90k revenue (first tranche, concrete and delivered).
LTRX · Q3 2024 → YESThe question is about whether management describes one identifiable engine of new business that meets two criteria: a first tranche has actually landed in the just-reported period, and larger tranches...